Industries

The areas we support

We work with property owners and landowners in Israel. Across all of these areas the starting point is the same data: consumption, tariff and on-site constraints.

Factories

Factories

High electricity consumption across the day, sensitivity to energy costs and a wish to reduce ongoing spend without disrupting production.

Suitability check of the building roofs
Consumption profile and tariff analysis
Option to combine with energy storage
Review of self-consumption alternatives
Warehouses

Warehouses

Large roof areas relative to actual electricity consumption. That situation needs a careful review of consumption and of how the generated electricity will be used.

Assessment of roof area and load-bearing capacity
Review of actual electricity consumption
Review of models for using surplus
Layout planning around daily operations
Logistics centres

Logistics centres

Loads that vary through the day, extensive roof areas, and a need to plan in a way that does not interfere with operations and on-site works.

Analysis of varying loads
Review of roofs and ancillary structures
Installation planning around site schedules
Review of combining with storage
Packaging facilities

Packaging facilities

Long working hours and relatively steady electricity consumption — a situation that suits a solar system, but requires matching the roof layout and structural loads.

Consumption analysis by operating hours
Layout matched to structure and machinery
Review against grid connection limits
Accompanying installation throughout
Agricultural properties

Agricultural properties

Agricultural land used for farming — which can simultaneously host power generation, subject to agronomic, planning and regulatory suitability.

Agronomic assessment of the crop
Access, drainage and irrigation considerations
Review of the planning and regulatory framework
Review of grid connection options
Commercial buildings

Commercial buildings

Office, retail and mixed-use buildings with daytime electricity consumption, and sometimes with day-to-day requirements from tenants and occupiers.

Suitability check of the roof and systems
Consumption analysis by use
Planning that does not disrupt tenants
Review of combining storage and charging

Suitability is determined separately for every project. An area of activity appearing here does not indicate automatic suitability for a specific site, and is not a commitment.

Start with a check

Let us look at what is possible at your site

Send us the property or land details and consumption data, and we will come back with an initial view of suitability.